{"release_valid":true,"release_errors":[],"release_id":"KY_DEMO_BASEPLANE_V1@1.0.0","release_binding":{"baseplane_id":"KY_DEMO_BASEPLANE_V1","baseplane_revision":"1.0.0","ruleset_revision":"1.0.0","concept_dictionary_revision":"1.0.0","authority_profile_revision":"1.0.0","runtime_policy_revision":"1.0.0","accepted_manifest_id":"KY_DEMO_ACCEPTED_RELEASE_MANIFEST_V1","accepted_manifest_revision":"1.1.0","accepted_manifest_sha256":"8bfea4baf842b59f6987c0915d2ee37dcb7ce8139423c5e88e4b9df7bd0379f5","input_schema_id":"https://yamrail.invalid/schemas/ky-demo/luna-input.v1.json","input_schema_revision":"1.1.0","input_schema_sha256":"366d41d7c3ab79711bc612b0a2358c3ea56e1155cf5645581860aa06017269d7","output_schema_id":"https://yamrail.invalid/schemas/ky-demo/luna-output.v1.json","output_schema_revision":"1.1.0","output_schema_sha256":"b8fc0420c21283251305f1df8a081c6b466618a2d88bd28e353b8207e866eb94","provider_output_schema_id":"https://yamrail.invalid/schemas/ky-demo/luna-provider-output.v1.json","provider_output_schema_revision":"1.0.0","provider_output_schema_sha256":"4895c98f41bed91d1a3639c04925848e04f47c92609f6820ebb38d9fa170fc2d","fixture_set_id":"KY_DEMO_LUX_BREAK_FIXTURES_V1","fixture_set_revision":"1.0.0","fixture_set_sha256":"bbeb16752f03c70c8186d1f6d8a286a10f0904c8d5e71181c6f1c49d92a4a4b7"},"content_manifest_sha256":"8bfea4baf842b59f6987c0915d2ee37dcb7ce8139423c5e88e4b9df7bd0379f5","work_types":[{"work_type_id":"WT-EARTH-EXCAVATION-001","status":"INFERRED_FROM_PUBLIC_WORKS_CANDIDATE","labels":{"ja-JP":"土工・掘削・積込","en":"Earthwork, excavation and loading"},"required_module_ids":["HM-PLANT-PEOPLE-001","HM-EXCAVATION-COLLAPSE-001","HM-BURIED-UTILITY-001","HM-FALL-EDGE-001","HM-SUSPENDED-LOAD-001","HM-TRAFFIC-THIRD-PARTY-001","HM-ATMOSPHERE-001"]},{"work_type_id":"WT-ROAD-PAVING-001","status":"INFERRED_FROM_PUBLIC_WORKS_CANDIDATE","labels":{"ja-JP":"道路・舗装","en":"Road and paving works"},"required_module_ids":["HM-PLANT-PEOPLE-001","HM-TRAFFIC-THIRD-PARTY-001","HM-HOT-MATERIAL-001","HM-BURIED-UTILITY-001","HM-FALL-EDGE-001","HM-SLIP-TRIP-MANUAL-001"]},{"work_type_id":"WT-PORT-REVETMENT-001","status":"INFERRED_FROM_PUBLIC_WORKS_CANDIDATE","labels":{"ja-JP":"港湾・護岸・ブロック据付","en":"Port, revetment and block placement works"},"required_module_ids":["HM-SUSPENDED-LOAD-001","HM-WATER-WAVE-FLOOD-001","HM-FALL-EDGE-001","HM-PLANT-PEOPLE-001","HM-TEMPORARY-STABILITY-001","HM-TRAFFIC-THIRD-PARTY-001","HM-SLIP-TRIP-MANUAL-001"]},{"work_type_id":"WT-STRUCTURE-SUBSTRUCTURE-001","status":"INFERRED_FROM_PUBLIC_WORKS_CANDIDATE","labels":{"ja-JP":"構造物・橋梁下部・擁壁","en":"Structures, bridge substructures and retaining walls"},"required_module_ids":["HM-SUSPENDED-LOAD-001","HM-FALL-EDGE-001","HM-TEMPORARY-STABILITY-001","HM-PLANT-PEOPLE-001","HM-BURIED-UTILITY-001","HM-TRAFFIC-THIRD-PARTY-001"]},{"work_type_id":"WT-SLOPE-RIVER-RESTORATION-001","status":"INFERRED_FROM_PUBLIC_WORKS_CANDIDATE","labels":{"ja-JP":"法面・河川・災害復旧","en":"Slope, river and disaster restoration works"},"required_module_ids":["HM-SLOPE-ROCKFALL-001","HM-EXCAVATION-COLLAPSE-001","HM-FALL-EDGE-001","HM-PLANT-PEOPLE-001","HM-WATER-WAVE-FLOOD-001","HM-TRAFFIC-THIRD-PARTY-001","HM-SUSPENDED-LOAD-001"]}],"hazard_modules":{"HM-PLANT-PEOPLE-001":{"ja-JP":"重機の走行・旋回と人の混在","en":"Mobile plant and people interface"},"HM-EXCAVATION-COLLAPSE-001":{"ja-JP":"掘削面・溝・地山の崩壊","en":"Excavation, trench and ground collapse"},"HM-FALL-EDGE-001":{"ja-JP":"開口・端部・高所・法肩からの墜落・転落","en":"Falls from openings, edges, height or shoulders"},"HM-SUSPENDED-LOAD-001":{"ja-JP":"吊荷・据付物・飛来落下","en":"Suspended loads, placement and falling objects"},"HM-TRAFFIC-THIRD-PARTY-001":{"ja-JP":"工事車両・公道・第三者動線","en":"Construction traffic, public roads and third parties"},"HM-WATER-WAVE-FLOOD-001":{"ja-JP":"増水・潮位・波浪・転落時のおぼれ","en":"Flooding, tide, waves and drowning after a fall"},"HM-ATMOSPHERE-001":{"ja-JP":"酸欠・有害ガス・可燃性雰囲気","en":"Oxygen deficiency, hazardous gas and flammable atmosphere"},"HM-BURIED-UTILITY-001":{"ja-JP":"埋設物・架空線・既設設備との干渉","en":"Buried services, overhead lines and existing utilities"},"HM-HOT-MATERIAL-001":{"ja-JP":"高温材料・火災・やけど","en":"Hot materials, fire and burns"},"HM-SLIP-TRIP-MANUAL-001":{"ja-JP":"足元・通路・無理な動作","en":"Footing, access and overexertion"},"HM-SLOPE-ROCKFALL-001":{"ja-JP":"法面崩壊・落石・上下作業","en":"Slope collapse, rockfall and work at different levels"},"HM-TEMPORARY-STABILITY-001":{"ja-JP":"仮設・型枠支保工・据付途中の安定","en":"Temporary works, falsework and intermediate stability"}},"runtime_model_role":"LUNA","sol_runtime_invocation":false,"canonical_mutation":false,"external_information_default":"OFF","location_automatic":false}